I’m not 100% sure but according to memory and docs Scheduled downtimes. only the start of the flexible downtime has to be within the defined start->end time slot, the actual downtime will be for the downtime duration which can be longer.
I’m not 100% sure but according to memory and docs Scheduled downtimes. only the start of the flexible downtime has to be within the defined start->end time slot, the actual downtime will be for the downtime duration which can be longer.